Switchboard construction and customised electrical control solutions

Elite Electrical Controls provides a comprehensive range of switchboard construction services and customised electrical control solutions designed to meet the needs of mining, process, commercial and industrial environments.

The team combines quality workmanship with modern technologies to deliver reliable, safe, and efficient systems that support everything from day‑to‑day operations to large‑scale projects.

Whether a client requires new switchboard design and fabrication, upgrades to existing equipment, or fully integrated control systems, Elite Electrical Controls offers tailored solutions backed by professional guidance and a commitment to long‑term performance.

Our services include:

  • Main Switchboards
  • Distribution Switchboards
  • Control Panels
  • PLC Cubicles
  • Motor Control Centres
  • Industrial installations including large generators and hazardous area work

Attention to detail in every build

We use high quality consumables throughout every enclosure, including:

  • Cabling
  • Ducting
  • Terminals
  • Phoenix Contact wire and terminal marking systems
  • Traffolyte labelling for internal equipment
  • Stainless steel or UV‑stabilised Traffolyte for external identification

Traceability and documentation

Using SIMPRO, every switchboard receives a designated serial number for:

  • Warranty tracking
  • Full parts traceability
  • Project duplication if required
  • Reliable access to all component information

Client collaboration and support

  • Design support
  • Layout planning
  • User‑friendly solutions
  • Cost‑effective and neat installation methods
  • Client function testing support

Clients are welcome at our workshop to conduct inspections and full function testing prior to crating and dispatch. Temporary power can be introduced for testing, and clients can complete PLC programming or software installation as required. This process helps reduce onsite testing time and gives clients complete confidence before installation begins.